From excavation to the final cleaning of the home, it usually takes between 4 to 6 months to complete the building of a home. (That is assuming the home is started in early summer time)
After the land has been purchased and you have your financing ready, plans then can be made for a house. It will take 6-8 weeks for the architect and engineer to create a buildable house plan. After the plans are complete, we can submit for a building permit. 4-6 weeks is a good turn around time for a permit, but it can take longer sometimes.
The price per square foot given includes the structures and finishes only. Permits, Excavation, Utilities, and a driveway are all additional expenses. If you have a flat Lot that is located with in city limits and has the water, sewer, and electrical stubbed on to the Lot. The estimated cost would be around $25,000 for permits, and $25,000 for excavation, utility install, and a 20' wide by 20' deep gravel driveway.
Copyright © 2023 Simple Mountain Homes, LLC - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.